272
Continued.
$ 3,178.94
Brass ostah for W.O.1 Doors 1-1/2" Brass: hinges
44
5*
Double brass cloak hooks
4 No. 5.00-
30- 5. Pairs 2-1/4′ Ibs.per: pair: 40 # DO 2-3/4
do.
14'
24' No.1
201
1 50
38
*1.20
16 80-
25.
Brass pivots, and fastenings with bord | 14′ Prs. 1,50
To Sumary
21 3,880.24
Plumberla
Lead in flats fo.if asphalt and qonorate, say
300
1/8" lead pipe
59 L.Ft.80
29 50
da.:
63
#{
70:
4340
Brass stopcock
1 No. 15.
175.
3/4*
do bit do
*
Brada: Valves for Gavatory basins: 1-1/8" Lead 8.) Traps, with inapec-tion osp
1.00 Set 10,00
5
80
7
No. 8.50-
Cxps to Ventilating pipes:
125.
17 50 3 76.
later waste preventing cisterns in and iscinding iron brackets
*: 12.00-
60
*Haab Down*: 1.5.) apparatue
*: 12,00
80
Sets of Lavatory basins complete
W 180,00
120
do. Uribals and trap
do.'
#90,00
70
Caretakeria Bath
• 10,00
101
dairaaksed supply cistern, with ball cook & poppar float
1 * 50,00
50
201
Brass grating to open channel
ft.
850.90-
To Summary
Swith and Founder,1
Gast Iron.
4" square rain water pipe, jointed in ail cement: with ornamental ears
}
28 : 165.
48 20
Extra plinth bends
Do.: Shoes:
90-
3 30
4' No.
00:
af 80
do.:
do.
Rain Water Heads:
4a Galvanized pipe with caulked jointe
do.1
Extra to bend in 3”
Mica flap to freshair: inlet freshair
4* Grating
Spiral stairs
Oil cooking store for Attendants
Brackets to 1.0.1 flaps
Brought Iron
In joists and girders and hoisting and fixing at various levels 5.87 per 578741b 8.00 10
100 tho Continued.
weiald
4
0.00
34
15. 6.1.5E
24 75
4'
1.90
780
1 No. 9.00
1. W:
1
50:
3
* 10.00
150 10
1.00
3,472.80
$
3,752.75
272
Continued.
$ 3,178 94
Brass ostah for W.0.1 Doors 1-1/2" Brass: hingas
44
5*
Double brass cloak hooks
4 No. 5.00-
30- 5. Pairs 2-1/4′ Ibs.per: pair: 40 # DO 2-3/4
do.
14'
24' No.1
201
1 50
38
*1.20
16 80-
25.
Brass pivots, and fastenings with bord | 14′ Prs. 1,50
To Sumary
21 3,880 24
Plumberla
Lead in flats fo.if asphalt and
qonorate, say
300
1/8" lead pipe
59 L.Ft.80
29 50
da.:
63
#{
70:
4340
Brass stopcock
1 No. 15.
175.
3/4*
do bit do
*
Brada: Valves for Gavatory basins: 1-1/8" Lead 8.) Traps, with inapec- tion osp
1.00 Set 10,00
5
80
7
No. 8.50-
Cxps to Ventilating pipes:
125.
17 50 3 76.
later waste preventing cisterns in and
iscinding iron brackets
*: 12.00-
60
*Haab Down*: 1.5.) apparatue
*: 12,00
80
Sets of Lavatory basins complete
W 180,00
120
do. Uribals and trap
do.'
#90,00
70
Caretakeria Bath
• 10,00
101
dairaaksed supply cistern, with ball
cook & poppar float
1 * 50,00
50
201
Brass grating to open channel
ft.
850 90-
To Summary
Swith and Founder,1
Gast Iron.
4" square rain water pipe, jointed
in ail cement: with ornamental ears
}
28 : 165.
48 20
Extra plinth bends
Do.: Shoes:
90-
3 30
4' No.
00:
af 80
do.:
do.
Rain Water Heads:
4a Galvanized pipe with caulked jointe
do.1
Extra to bend in 3”
Mica flap to freshair: inlet
freshair
4* Grating
Spiral stairs
Oil cooking store for Attendants
Brackets to 1.0.1 flaps
Brought Iron
In joists and girders and hoisting
and fixing at various levels 5.87 per 578741b 8.00 10
100 tho Continued.
weiald
4
0.00
34
15. 6.1.5E
24 75
4'
1.90
780
1 No. 9.00
1. W:
1
50:
3
* 10.00
150 10
1.00
3,472 80
$
3,752 75
No comments yet.